Putrajaya Hotels and Vacations. Putrajaya an "Intelligent Garden City" and the federal administrative capital of Malaysia, is a showcase city some 30 km south of the capital Kuala Lumpur. Adjacent sister city Cyberjaya is built along the same lines, but is aimed at attracting the IT industry. Plan a Putrajaya vacation with reviews, tips and photos posted by real travelers and Putrajaya locals.
Tuesday, April 1, 2008
Marriott
Putrajaya Marriott Hotel welcomes you to Malaysia’s Federal Government Administrative Capital. Situated at the renowned IOI Resort, this luxury hotel is nestled between serene surroundings of a 27 hole championship golf course.
Majestically and strategically located just 25 minutes from Kuala Lumpur and Petaling Jaya, it is a sophisticated resort address still within the city.
IOI Resort
62502, Putrajaya
Malaysia
Tel : 603-8949 8888
Fax : 603-8949 8999
WEBSITE : http://www.hotelscombined.com/Hotel/Marriott_Putrajaya.htm?a_aid=10181
Subscribe to:
Post Comments (Atom)
Putrajaya Bridge
Project Description:
Construction of Putrajaya bridge started in June 1998 and was completed in 2000. The bridge consists of 2 pylons which is 53 m. high and 1 arch bridge which is 32 m. high.
The main span length is equal to 300 m.
For hangers of arch, 50 tons of 46 BBR DINA 120 dia. 7 mm. are installed..
For stay cables, 750 tons of 84 BBR CONA are installed; 44 main cable stay and 40 for back stay cables, with lengths varying from 60 to 160 m. .
Technical Specifications: .
Span: 1 span of 300 m .
Stay Arrangement: Double plane .
Superstructure: Deck width: 32 m,.
Shape: box girder,.
Material: precast concrete .
Pylon: 2 pylons,.
Height: 53 m,.
Material: in situ concrete .
Arches: Span: 300 m,.
Height: 32 m,.
Material: steel .
Stay Cables: 84 BBR CONA from 43 x 0.6" to 91 x 0.6",.
Total quantity: 750 t,.
Cable lengths: from 60 to 160 m .
Hangers: 46 BBR DINA 120 dia. 7 mm,.
Total quantity: 50t .
The main span length is equal to 300 m.
For hangers of arch, 50 tons of 46 BBR DINA 120 dia. 7 mm. are installed..
For stay cables, 750 tons of 84 BBR CONA are installed; 44 main cable stay and 40 for back stay cables, with lengths varying from 60 to 160 m. .
Technical Specifications: .
Span: 1 span of 300 m .
Stay Arrangement: Double plane .
Superstructure: Deck width: 32 m,.
Shape: box girder,.
Material: precast concrete .
Pylon: 2 pylons,.
Height: 53 m,.
Material: in situ concrete .
Arches: Span: 300 m,.
Height: 32 m,.
Material: steel .
Stay Cables: 84 BBR CONA from 43 x 0.6" to 91 x 0.6",.
Total quantity: 750 t,.
Cable lengths: from 60 to 160 m .
Hangers: 46 BBR DINA 120 dia. 7 mm,.
Total quantity: 50t .