Putrajaya Hotels and Vacations. Putrajaya an "Intelligent Garden City" and the federal administrative capital of Malaysia, is a showcase city some 30 km south of the capital Kuala Lumpur. Adjacent sister city Cyberjaya is built along the same lines, but is aimed at attracting the IT industry. Plan a Putrajaya vacation with reviews, tips and photos posted by real travelers and Putrajaya locals.
Tuesday, April 1, 2008
Putrajaya Shangri-La
The Putrajaya Shangri-La overlooks Malaysia's innovative new garden city. Both a hotel in a park and a park inside a hotel, Shangri-La's fine restaurants, incomparable service and subdued elegance evoke comfort, peace and relaxation.
Taman Putra Perdana
Presint 1
62000 Wilayah Perseketuan Putrajaya, Malaysia
T: (60 3) 8887 8888
F: (60 3) 8887 8889
Website : http://www.shangri-la.com/en/property/kualalumpur/putrajayashangrila
Subscribe to:
Post Comments (Atom)
Putrajaya Bridge
Project Description:
Construction of Putrajaya bridge started in June 1998 and was completed in 2000. The bridge consists of 2 pylons which is 53 m. high and 1 arch bridge which is 32 m. high.
The main span length is equal to 300 m.
For hangers of arch, 50 tons of 46 BBR DINA 120 dia. 7 mm. are installed..
For stay cables, 750 tons of 84 BBR CONA are installed; 44 main cable stay and 40 for back stay cables, with lengths varying from 60 to 160 m. .
Technical Specifications: .
Span: 1 span of 300 m .
Stay Arrangement: Double plane .
Superstructure: Deck width: 32 m,.
Shape: box girder,.
Material: precast concrete .
Pylon: 2 pylons,.
Height: 53 m,.
Material: in situ concrete .
Arches: Span: 300 m,.
Height: 32 m,.
Material: steel .
Stay Cables: 84 BBR CONA from 43 x 0.6" to 91 x 0.6",.
Total quantity: 750 t,.
Cable lengths: from 60 to 160 m .
Hangers: 46 BBR DINA 120 dia. 7 mm,.
Total quantity: 50t .
The main span length is equal to 300 m.
For hangers of arch, 50 tons of 46 BBR DINA 120 dia. 7 mm. are installed..
For stay cables, 750 tons of 84 BBR CONA are installed; 44 main cable stay and 40 for back stay cables, with lengths varying from 60 to 160 m. .
Technical Specifications: .
Span: 1 span of 300 m .
Stay Arrangement: Double plane .
Superstructure: Deck width: 32 m,.
Shape: box girder,.
Material: precast concrete .
Pylon: 2 pylons,.
Height: 53 m,.
Material: in situ concrete .
Arches: Span: 300 m,.
Height: 32 m,.
Material: steel .
Stay Cables: 84 BBR CONA from 43 x 0.6" to 91 x 0.6",.
Total quantity: 750 t,.
Cable lengths: from 60 to 160 m .
Hangers: 46 BBR DINA 120 dia. 7 mm,.
Total quantity: 50t .