Friday, July 25, 2008

PICC : Sattelite View



In the center is a large boulevard. At one end there's the office of the prime-minister Badawi and at the other end is the PICC.
At the boulevard are beautiful offices, the stones on the road are coloured and even the lampposts are magnificent.

The PICC is the Putrajaya International Convention Center. This is a beautiful building for international conventions

No comments:


Putrajaya Bridge

Project Description: Construction of Putrajaya bridge started in June 1998 and was completed in 2000. The bridge consists of 2 pylons which is 53 m. high and 1 arch bridge which is 32 m. high.
The main span length is equal to 300 m.
For hangers of arch, 50 tons of 46 BBR DINA 120 dia. 7 mm. are installed..
For stay cables, 750 tons of 84 BBR CONA are installed; 44 main cable stay and 40 for back stay cables, with lengths varying from 60 to 160 m. .


Technical Specifications: .
Span: 1 span of 300 m .
Stay Arrangement: Double plane .
Superstructure: Deck width: 32 m,.
Shape: box girder,.
Material: precast concrete .
Pylon: 2 pylons,.
Height: 53 m,.
Material: in situ concrete .
Arches: Span: 300 m,.
Height: 32 m,.
Material: steel .
Stay Cables: 84 BBR CONA from 43 x 0.6" to 91 x 0.6",.
Total quantity: 750 t,.
Cable lengths: from 60 to 160 m .
Hangers: 46 BBR DINA 120 dia. 7 mm,.
Total quantity: 50t .